Electrical distribution, Sub-sea cable

Sub-sea cable installation at the south coast of Sweden

Shore end cable protection installation

Project & location: “Möcklö-Senoren”, electrifying an island in the archipelago of Karlskrona, Sweden.
Purchaser: E.on
Entrepreneurs: Vattenfall Service, Tärnöbolagen and Pimmens Dykservice.
Product & quantities: 850 meters Snap Panzar™ 110 mm to protect the cable. Every third meter accessory Snap Weight™ 18 kg was installed to fixate the cable to the sea-bed.